AIP504-10 Product datasheet
Model number: |
AIP504-10 |
|
Module Type: |
V-NET Coupler Module |
Manufacture: |
Yokogawa |
|
Condition: |
Brand New |
Range of Product: |
Yokogawa |
|
Lead time: |
In Stock |
Weight: |
0.3 kg |
|
HS CODE: |
8537101190 |
Dimension: |
2.1x10.2x15.2cm |
|
MOQ: |
1 |
Product Origin: |
JAPAN |
|
System: |
DCS |
Discontinued on: |
active |
|
Communication Service: |
Ethernet router |
AIP504-10 Functional Description
If you have other request contact our team to get customized service
Yokogawa |
VI451-11 |
Yokogawa |
ADV151-P53 S2 |
Yokogawa |
ASS9562DK-00 |
Yokogawa |
VC401-11 |
Yokogawa |
ADV151-P50 S2 |
Yokogawa |
ASS9881 DE-02 |
Yokogawa |
PW481-50 |
Yokogawa |
ADV151-P03 S2 |
Yokogawa |
ASS9981DE-01 |
Yokogawa |
PW441-11 |
Yokogawa |
ADV151-P00 S2 ATD5A-00 |
Yokogawa |
ATA4D-00 S2 |
Yokogawa |
AIP504-10 |
Yokogawa |
ADV151-E63 S2 |
Yokogawa |
ADV141-P12 S1 |
Yokogawa |
ADV551-P03 S2 |
Yokogawa |
ADV151-E60 S2 |
Yokogawa |
ADV141-P10 S1 |
Yokogawa |
ADV551-P00 S2 |
Yokogawa |
ADV151-E50 S2 |
Yokogawa |
ATD5A-00 S1 |
Yokogawa |
ADV161-P50 S2 |
Yokogawa |
ADV142-S03 S1 |
Yokogawa |
ATI3S-00 S2 |
Yokogawa |
ADV161-P00 S2 |
Yokogawa |
ADV142-S02 S1 |
Yokogawa |
ATK4A-00 S1 |
Yokogawa |
ADV159-P00 |
Yokogawa |
ADV142-P13 S1 |
Yokogawa |
ANT411-50 S1 |
The Bandwidth Limit Function and Preferential Forwarding of Control Communication Frames Function
The commonly used methods for determining the power supply unit capacity with consideration of the crest factor are shown below. Note that the power supply unit capacity should be finally decided after consulting with the power supply unit supplier:
• If the power unit crest factor is larger than the device crest factor, the power unit can be used to its full rated capacity. However, factors such as device inrush current, backup time, and reserve capacity must be taken into consideration separately.
• If the power unit crest factor is smaller than the device crest factor, the power unit capacity must be calculated using the following formula. Factors such as device inrush current, backup time, and reserve capacity must be taken into consideration separately.